Skip to content

40 Yard Dumpster Rental

Green Bay, WI

40 Yard Dumpster Rental in Green Bay, WI

A commercial demolition, a large new-build, or a project spanning multiple structures generates more debris than any residential-scale container can handle. You need something built for sustained volume, not a container you’ll be swapping every few days while the job is still underway. That’s the role a 40 yard dumpster fills, it’s the largest size we offer, built for the projects that genuinely need it.

Same-day delivery available in most Green Bay areas
22’L x 8’W x 8’HDimensions
12–16 Truck LoadsCapacity
$350 / 7 DaysPrice
5 Tons IncludedWeight Limit

This container measures about 22 feet long, 8 feet wide, and 8 feet tall, and it holds roughly 12 to 16 pickup truck loads of loose debris as a general comparison. It’s reserved for major commercial demolition, large-scale new construction, and projects where debris keeps coming for days or weeks at a time.

Dimensions

At 8 feet tall, this is significantly taller than every other size in our lineup, which is where most of the added capacity comes from since the length and width stay close to the 30 yard’s footprint. Because of its larger footprint and height, this size is a tighter fit for many residential driveways and is generally better suited to commercial sites or larger properties with clear delivery access.

How tall is a 40 yard dumpster? At about 8 feet tall, the side walls are substantially higher than residential-size containers, so loading from ground level is generally more practical with equipment.

Length22 feet
Width8 feet
Height8 feet
Door widthAbout 7.5 feet
Weight limit5 tons (10,000 lbs) included in base price

How Much Does a 40 Yard Roll Off Dumpster Really Hold?

A 40 yard roll off dumpster holds roughly 12 to 16 pickup truck loads of debris as a general comparison, not an exact measurement, and that comparison assumes loose debris rather than compacted material. In practical terms, that’s enough volume for framing, drywall, flooring, and general construction waste from a large commercial project or a demolition spanning multiple rooms or structures.

When Volume, Not Just Weight, Is the Problem

This is where the volume-versus-weight distinction matters most in our entire size lineup. Our 40 yard dumpster includes a 5 ton weight allowance, and it’s genuinely rare for someone to fill this container’s physical space with dense material before hitting that limit. Light construction debris like framing and drywall can fill the entire container without coming close to the weight allowance. Heavy material behaves completely differently, and reaches that same allowance far faster relative to the space it takes up.

40 Yard vs. 30 Yard: When to Size Up

If a 30 yard container is starting to feel too small for the actual scope of your project, here’s how to tell.

30 Yard40 Yard
Price$300 / 7 days$350 / 7 days
Capacity9–12 truck loads12–16 truck loads
Height6 feet8 feet
Weight limit4 tons5 tons
Best forFull demolition, large renovation, new constructionMajor commercial demolition, large-scale construction

Signs a 30 Yard Won’t Be Enough

  • Your project involves multiple buildings or a large commercial property
  • Debris generation is ongoing across a multi-week timeline, not a single defined phase
  • You’ve estimated more than 12 pickup truck loads
  • You’re managing a large-scale new construction project with sustained waste output
  • You’d rather avoid arranging repeated swaps on a demanding commercial schedule

When You Need More Than One Dumpster

Some projects genuinely exceed what even a 40 yard container can handle in a single rental, and that’s more common than people expect on large commercial jobs. If your project is genuinely commercial in scale, talk to us about your timeline and expected debris volume so we can plan the right setup from the start rather than reacting once the first container fills up.

Can I Rent More Than One Dumpster for a Large Project?

Yes, this is common for larger commercial demolition and construction jobs. Contact us with your project timeline and expected volume, and we’ll work out the right arrangement together.

Rental Price in Green Bay

$350per 7-day rental

Renting this size in Green Bay is $350 for 7 days, which includes delivery, pickup, and disposal. For a full breakdown of pricing across every size we offer, see our dumpster rental pricing page.

What’s Included

DeliveryIncluded
Rental period7 days
Weight allowance5 tons
PickupIncluded
DisposalIncluded

Same day or next day delivery may be available depending on location and scheduling. Going over the included weight allowance adds a charge based on the extra weight, and we’ll always tell you the amount before you’re billed.

What Projects Is This Size Good For?

1

Major Commercial Demolition

Tearing down or gutting a commercial structure produces a volume of framing, drywall, and structural debris that residential-scale containers aren’t built to handle.

2

Large-Scale New Construction

Extended new-build projects, especially commercial or multi-unit residential construction, generate steady debris over the life of the project, and this size reduces how often containers need to be swapped.

3

Multi-Building or Large Property Cleanouts

Clearing debris across more than one structure or a larger commercial property benefits from the added capacity this size provides over a single residential-scale container.

4

Extended Construction Projects with Ongoing Debris

Projects that run for weeks rather than days, with debris accumulating steadily throughout, are a natural fit for this size rather than repeatedly scheduling smaller pickups.

5

Industrial or Warehouse Cleanouts

Clearing out an industrial space or warehouse, including packaging material, old equipment, and general facility waste, typically produces enough volume to justify this size over a smaller option.

Can You Put Heavy Materials in It?

!

Generally, no, and this matters more here than at any other size. Concrete, brick, dirt, and dense demolition debris can exceed the weight allowance using only a small fraction of this container’s available space, so this size is rarely the right choice for a project that’s primarily heavy material, even though it has the most physical room of anything we offer.

If your project includes a significant amount of dense debris, talk to us before booking so we can recommend a more appropriate setup. For the full breakdown of accepted and restricted materials, see our dumpster materials guide.

Frequently Asked Questions

Is a 40 Yard Big Enough for a Commercial Demolition?

For most single-structure commercial demolitions, yes. Larger or multi-building projects may need more than one container, which we can help coordinate.

Does a 40 Yard Fit on a Residential Property?

It can, but its larger footprint and height make it a tighter fit for a standard residential driveway than the smaller sizes in our lineup. Larger properties or commercial sites with clear delivery access are generally a better match.

How Many Tons Does a 40 Yard Dumpster Hold?

Our 40 yard dumpster includes a 5 ton weight allowance as part of the standard rental.

Real Rental in Green Bay

Commercial Demolition · Green Bay Industrial Corridor

Commercial Demolition, Green Bay Industrial Corridor

A contractor handling the demolition of a commercial building near Green Bay’s industrial area needed sustained container service across a multi-week project. We provided a 40 yard container and coordinated pickup and delivery as the project progressed.

Ready for This Size?

Call now for availability, or reach out for help planning a large commercial project. For a full walkthrough of how delivery, filling, and pickup work, see our how dumpster rental works page.

📍 2425 Hutson Rd, Green Bay, WI 54303  |  📞 (920) 600-9925